Transmission option analysis
Supported a major wind project developer in the evaluation of transmission options to wheel several hundred megawatts from Northern Baja California, México, to California utilities. Supported project developer in challenging the timeliness and results of the interconnection feasibility study performed by the transmission owner under the CAISO Large Generator Interconnection Process and represented the developer in the Generator Interconnection Process Reform (GIPR) stakeholder meetings. The GIPR led to the current FERC-endorsed project cluster analysis approach to managing the CAISO interconnection queue.